9 Testing Laboratories
Includes Lab 8 and Lab 5, a 220 kV ultra-low partial-discharge shielding test laboratory, and a UHV transformer ultra-low partial-discharge shielding test laboratory.
JSHP operates state-of-the-art manufacturing facilities with approximately 100 acres of production floor space.
JSHP operates state-of-the-art manufacturing facilities with approximately 100 acres of production floor space. The campus includes:
Includes Lab 8 and Lab 5, a 220 kV ultra-low partial-discharge shielding test laboratory, and a UHV transformer ultra-low partial-discharge shielding test laboratory.
Large-power-transformer production is supported by 33 vapor-phase drying ovens, dedicated winding shops, and a 300-ton transformer core stacking table.
GigaShop #1 provides 32 acres and GigaShop #2 provides 36 acres of production space, with automatic tank welding, robotic bending, fiber-laser cutting, automatic coating and painting, and German-imported foil winding equipment.
Dedicated in-house radiator production supports quality control and reliable delivery schedules.
An in-house wire production workshop supports transformer winding operations.
Specialized EHV winding processes support JSHP’s high-voltage transformer portfolio.
Dedicated cast-resin shops support dry-type transformer manufacturing.
A dedicated distribution transformer shop provides production capacity of up to 30,000 units.
An automated high-bay warehouse supports efficient material storage and production logistics.
Augmented-reality-enabled production systems support standardized, traceable manufacturing workflows.
JSHP’s dedicated river pier behind its GigaShop provides 500-metric-ton handling capacity for large transformer shipments.
Eight fitness centers support employee wellness across the JSHP campus.